Cobo Center Canopy and Renovations

In late December of 2012 Mr. Geoffrey Harrison, President of the SDG Design Group approached Bob Darvas to study and propose an affordable structural scheme for the planned East Entry Canopy to the COBO Center. An earlier structural scheme was rejected for being far too costly.

There were several major components to the architectural concept. The glass-clad front had to be on the surface of a torus with a minimum span of 180 ft. plus 40 ft. extensions. The members were to project a so-called dia-grid pattern. The glass cladding had to be eccentric to the structure in order to provide space for the large video screen. The glass clad roof extending to the west at the top had to be large enough to provide protection to people traversing toward the main entry doors of Cobo Hall. Finally, the structure had to present a light, visually clear appearance.

Based on our many decades of experience with the design and construction of complex structures, it was quite clear to us that the successful solution required in developing a node, where the rigid (moment) connection of the six crossing members of the dia-grid can be easily accomplished by bolting. This concept allowed us to create a reticulated toroidal shell made up of steel members, fully continuous at the nodes, easily absorbing the bending moments at the nodes from the eccentric weight of the glass and the video screen.

RDA’s design has saved several millions of dollars in construction cost by reducing the structural steel to less than 1/3-rd when compared to the earlier scheme and creating an easily constructible structure. As Mr. Harrison commented: “Bob, without your design, the canopy would never have happened.”

Visit online at www.cobocenter.com.

  • Credits
  • Location – Detroit, MI
  • Project Completed – 2013
  • SDG Design Group, Detroit, MI – Executive Architects
  • TVS Design Inc., Atlanta, GA
  • Rosetti Architects Inc., Detroit, MI – Associate Architects
  • Midwest Steel Supply Inc., Detroit, MI – Erectors
  • Thomas Steel Inc. Bellevue, OH – Fabricators
  • Robert M. Darvas, SE, PE, RDA – Structural Engineer
  • Nadir Makhlouf, RDA – Project Manager
Share This:

Related ProjectsYou might also be interested in these

Cobo Center Canopy and Renovations

In late December of 2012 Mr. Geoffrey Harrison, President of the SDG Design Group approached Bob

Traverwood Branch Library

The Traverwood Branch Library is a one story library building with underground parking that brought

EnV Tower

The EnV Tower is a 28 story post-tensioned concrete, mixed-use building in downtown Chicago. The

3COM Regional Complex

This project was phase one of 3COM’s midwest corporate complex. It was created around an

201 Depot Street Office Building

The 201 Depot Street Office Building sits on the north side of Ann Arbor, situated in the flood

Mark Jefferson Science Building

The 110,000 square foot science complex includes a grand atrium, suspended planetarium and

Kresge

Credits Location – Project Completed – – Architects – General Contractor RDA

University of Chicago Student Housing

 The University of Chicago Student Housing project is a 14 floor mixed-use collegiate residential

Globe Dry Dock Buildings Renovation

 Structural Survey of historic masonry and steel frame factory buildings for adaptive reuse into an

Albion College Science Complex

The Science Complex at Albion College, Albion, MI was a project consisting of the renovation of

Brody Hall Addition and Renovation

The client’s goal for the project is a dynamic environment celebrating student life while

1401 South Main Street Apartment Building, Chicago, IL

A 21 floor mixed use concrete building including first floor retail, above ground parking deck, 17